Capacity Inputs
Capacity is modelled line by line. Available monthly throughput reflects performance rate, staffing pattern, cycle time, planned downtime and — for future lines — the ramp-up curve from start of production.
Manufacturing lines
Select a line to inspect its capacity build-up
| Line | Technology | PR | Crews | Nominal | Status |
|---|---|---|---|---|---|
EU Line 01 EU Site Group A · Europe | Premium Handle Technology | 77% | 3 | 9.6 | Validated |
EU Line 02 EU Site Group A · Europe | Core Handle Technology | 79% | 3 | 12.4 | Validated |
NA Line 01 NA Site Group B · North America | Premium Handle Technology | 81% | 4 | 13.8 | Validated |
NA Line 02 NA Site Group B · North America | Core Handle Technology | 75% | 3 | 10.2 | Pending validation |
APAC Line 01 APAC Site Group C · Asia Pacific | Core Handle Technology | 80% | 4 | 15.6 | Validated |
APAC Line 02 APAC Site Group D · Asia Pacific | Refill Technology A | 76% | 3 | 12.6 | Validated |
EU Line 03 (Future) EU Site Group A · Europe | Premium Handle Technology | 74% | 3 | 11.4 | Future line |
EU Line 01
Capacity build-up under the active scenario
Ramp-up curves
Percent of nominal capacity from SOP
First line at site
Second line at site
Third line at site
Selected lineA new line does not deliver full output on day one. The selected line reaches nominal output after 7 months.
Site submissions
Capacity owners maintain their own lines
EU Site Group A
L. Brenner · 3 lines · 22 Jul 2026
NA Site Group B
K. Idowu · 2 lines · 18 Jul 2026
APAC Site Group C
S. Tanaka · 1 lines · 21 Jul 2026
APAC Site Group D
S. Tanaka · 1 lines · 12 Jul 2026
Capacity versions
Scenario-ready line models
L. Brenner · 19 Apr 2026 · 7 lines
Pre-commissioning line model.
L. Brenner · 22 Jul 2026 · 7 lines
Current line model incl. future EU line.
Note
Capacity values are synthetic and expressed in million standard units (MSU) for concept purposes.